SUYI ONE Logo

SUYI ONE

IDC / Solar / Compute

Data Center in Malaysia
IDC + Server Financing + Solar

Green-powered IDC & server leasing in Johor, Malaysia.

Rack & power leasing, financed server leasing, full IDC operations, AI clusters and solar-powered infrastructure - with 36-60 month terms.

Density

10-30 kW racks

Terms

36-60 month leasing

Location

Johor & KL

About SUYI ONE

IDC + Server Financing + Computing Hosting + Solar Power Integration

In Johor Bahru, Malaysia, a one-stop integrated service provider with solar green electricity offer IDC rack leasing, server installment leasing, and computing power management.

Company

SUYI ONE SDN. BHD.

Registration

202401043633 (1589479-H)

Location

Kuala Lumpur & Johor

Services Background

The turnkey project of six main services

IDC, server financing, computing power delivery, and green electricity access, delivered end-to-end by a professional team.

IDC rack and power leasing services

01

High-density rack configurations providing cooling, power supply, security, and real-time monitoring, specifically optimized for GPU/HPC workloads.

  • 10-30 kW high-density racks
  • Fully managed power, cooling, security
  • GPU / HPC / AI ready

Server Leasing (36-60 Months)

02

SUYI ONE advances hardware and IDC fees; clients pay monthly, converting CAPEX to OPEX.

  • 36-60 month financing terms
  • The hosting service of IDC Operation and Maintenance
  • Flexible GPU/CPU configurations

Delivering IDC + Computing Power Projects

03

Server procurement, rack installation, cabling, technical documentation, and daily IDC operation and maintenance management, delivered and launch at one time.

  • Server sourcing & logistics
  • Rack install, cabling, labeling
  • Real-time monitoring alerts and SLA service level reports

AI Cluster and SuperPod Deployment Services

04

High-speed interconnect architecture design, stability testing, and performance verification for 5090, H200, B200/B300, and GB300.

  • InfiniBand or high-speed Ethernet
  • Fabric Network calibration and stability testing verification
  • SuperPod-class orchestration

IDC Modernization and Upgrade

05

Optimization and improvement of cooling, power configuration, and rack density to make the data center compatible with next-generation GPU architecture.

  • Cooling retrofit & containment
  • Power system resiliency
  • Density optimization

Solar and Green Electricity Connection Solution

06

Solar EPC + Energy Storage System, providing a long-term and stable renewable energy supply for IDC.

  • Rooftop / industrial / solar farm EPC
  • Energy storage system connection and power load management
  • RE / REC / PPA options

Solutions by customers

Overseas clients

Oversea customer: Deploy the advanced IDC infrastructure in Johor Bahru and offer the localized technical support and compliance management services.

AI / GPU tenants

Offer GPU servers with flexible lease terms of 36-60 months, along with full lifecycle computing power operation and maintenance management.

Building / IDC owners

Improve the density of server racks and the power supply resilience by modernizing and the integration of green energy.

Solar Farm in Malaysia

Integrating green energy and solar energy

Building a sustainable computing ecosystem with renewable energy.

Solar power station construction services

EPC of commercial and industrial Earthbound solar energy stations, providing operation, maintenance, and system monitoring.

IDC Green Power Supply Solution

10-25 year renewable energy power supply contracts, improving ESG performance and reducing power operating costs.

Solar + Energy Storage Integration Solution

Be able to responses to the change in GPU data center operation by dynamic energy storage and intelligent load management.

High-performance computing power reserve plan

Making full preparations for the next trend of AI technology.

NVIDIA H200

Next-gen AI inference & training

High Performance

NVIDIA B200

Blackwell architecture for massive scale

High Performance

NVIDIA B300

Blackwell Ultra architecture, ultimate compute density

High Performance

NVIDIA GB300

Future-proof liquid cooling ready

High Performance

NVIDIA 5090

High-density workstation clusters

High Performance

Key strategic location: Johor Bahru

The best balance between connectivity and cost-effectiveness.

Next to Singapore

Low-latency network architecture direct connect to Southeast Asia's digital economy center.

Green Energy

Abundant solar resources for sustainable operations.

Cost Efficiency

Competitive power and operational costs vs Singapore.

Complete delivery process

One-stop integration service from procurement to operation and maintenance management.

1

Procurement

Global sourcing of GPU servers & network gear.

2

Logistics

Secure shipping & customs clearance handling.

3

Deployment and Implementation

Rack Installation, cabling configuration, and stability testing and verification.

4

Operations and maintenance management

24/7 monitoring, regular maintenance, and computing resource management.